2 changes: 1 addition & 1 deletion .bumpversion.cfg
Original file line number Diff line number Diff line change
@@ -1,5 +1,5 @@
[bumpversion]
current_version = 3.19.2
current_version = 3.19.3
commit = True
tag = True

Expand Down
2 changes: 1 addition & 1 deletion .cookiecutterrc
Original file line number Diff line number Diff line change
Expand Up @@ -54,7 +54,7 @@ default_context:
sphinx_doctest: "no"
sphinx_theme: "sphinx-py3doc-enhanced-theme"
test_matrix_separate_coverage: "no"
version: 3.19.2
version: 3.19.3
version_manager: "bump2version"
website: "https://github.com/NREL"
year_from: "2023"
Expand Down
2 changes: 1 addition & 1 deletion CHANGELOG.rst
Original file line number Diff line number Diff line change
Expand Up @@ -8,7 +8,7 @@ GEOPHIRES v3 (2023-2026)
3.19
^^^^

3.19.2: `Redrilling Learning Rate <https://github.com/softwareengineerprogrammer/GEOPHIRES/pull/190>`__ | `release <https://github.com/NREL/GEOPHIRES-X/releases/tag/v3.19.2>`__
3.19.3: `Redrilling Learning Rate; 100 MW EGS Case Study Update (Fervo_Project_Cape-8) <https://github.com/softwareengineerprogrammer/GEOPHIRES/pull/190>`__ | `release <https://github.com/NREL/GEOPHIRES-X/releases/tag/v3.19.3>`__

3.19: `Apply Surface Plant Capital Cost Adjustment Factor to provided Capital Cost for Power Plant for Electricity Generation <https://github.com/NatLabRockies/GEOPHIRES-X/pull/532>`__; `500 MW EGS Case Study Update (Fervo_Project_Cape-7); Depreciation Schedule (5-year MACRS) <https://github.com/NREL/GEOPHIRES-X/pull/531>`__ | `release <https://github.com/NREL/GEOPHIRES-X/releases/tag/v3.19.0>`__ | **Changed:** Surface Plant Capital Cost Adjustment Factor is now applied when Capital Cost for Power Plant for Electricity Generation is provided, consistent with drilling and stimulation cost handling. See `the tracking issue <https://github.com/NatLabRockies/GEOPHIRES-X/issues/435>`__ for details.

Expand Down
26 changes: 15 additions & 11 deletions README.rst
Original file line number Diff line number Diff line change
Expand Up @@ -58,9 +58,9 @@ Free software: `MIT license <LICENSE>`__
:alt: Supported implementations
:target: https://pypi.org/project/geophires-x

.. |commits-since| image:: https://img.shields.io/github/commits-since/softwareengineerprogrammer/GEOPHIRES-X/v3.19.2.svg
.. |commits-since| image:: https://img.shields.io/github/commits-since/softwareengineerprogrammer/GEOPHIRES-X/v3.19.3.svg
:alt: Commits since latest release
:target: https://github.com/softwareengineerprogrammer/GEOPHIRES-X/compare/v3.19.2...main
:target: https://github.com/softwareengineerprogrammer/GEOPHIRES-X/compare/v3.19.3...main

.. |docs| image:: https://readthedocs.org/projects/GEOPHIRES-X/badge/?style=flat
:target: https://softwareengineerprogrammer.github.io/GEOPHIRES
Expand Down Expand Up @@ -168,18 +168,14 @@ Example-specific web interface deeplinks are listed in the Link column.
- Input file
- Case report file
- Link
* - Case Study: 500 MW EGS Modeled on Fervo Cape Station (February 2026 Update) (`documentation <https://softwareengineerprogrammer.github.io/GEOPHIRES/Fervo_Project_Cape-5.html>`__)
- `Fervo_Project_Cape-5.txt <tests/examples/Fervo_Project_Cape-5.txt>`__
- `.out <tests/examples/Fervo_Project_Cape-5.out>`__
- `link <https://gtp.scientificwebservices.com/geophires?geophires-example-id=Fervo_Project_Cape-5>`__
* - 100 MW EGS Modeled on Fervo Cape Station (February 2026 Update)
- `Fervo_Project_Cape-6.txt <tests/examples/Fervo_Project_Cape-6.txt>`__
- `.out <tests/examples/Fervo_Project_Cape-6.out>`__
- `link <https://gtp.scientificwebservices.com/geophires?geophires-example-id=Fervo_Project_Cape-6>`__
* - [Preview] Case Study: 500 MW EGS Modeled on Fervo Cape Station (October 2026 Update) (`documentation <https://softwareengineerprogrammer.github.io/GEOPHIRES/Fervo_Project_Cape-7.html>`__)
* - Case Study: 500 MW EGS Modeled on Fervo Cape Station (October 2026 Update) (`documentation <https://softwareengineerprogrammer.github.io/GEOPHIRES/Fervo_Project_Cape-7.html>`__)
- `Fervo_Project_Cape-7.txt <tests/examples/Fervo_Project_Cape-7.txt>`__
- `.out <tests/examples/Fervo_Project_Cape-7.out>`__
- `link <https://gtp.scientificwebservices.com/geophires?geophires-example-id=Fervo_Project_Cape-7>`__
* - Case Study: 100 MW EGS Modeled on Fervo Cape Station (October 2026 Update) (`documentation <https://softwareengineerprogrammer.github.io/GEOPHIRES/Fervo_Project_Cape-8.html>`__)
- `Fervo_Project_Cape-7.txt <tests/examples/Fervo_Project_Cape-8.txt>`__
- `.out <tests/examples/Fervo_Project_Cape-8.out>`__
- `link <https://gtp.scientificwebservices.com/geophires?geophires-example-id=Fervo_Project_Cape-8>`__
* -  
-  
-  
Expand Down Expand Up @@ -424,6 +420,14 @@ Example-specific web interface deeplinks are listed in the Link column.
- `Fervo_Project_Cape-4.txt <tests/examples/Fervo_Project_Cape-4.txt>`__
- `.out <tests/examples/Fervo_Project_Cape-4.out>`__
- `link <https://gtp.scientificwebservices.com/geophires?geophires-example-id=Fervo_Project_Cape-4>`__
* - Fervo Cape Station 5: [Deprecated] Case Study: 500 MW EGS Modeled on Fervo Cape Station (February 2026 Update) (`documentation <https://softwareengineerprogrammer.github.io/GEOPHIRES/Fervo_Project_Cape-5.html>`__)
- `Fervo_Project_Cape-5.txt <tests/examples/Fervo_Project_Cape-5.txt>`__
- `.out <tests/examples/Fervo_Project_Cape-5.out>`__
- `link <https://gtp.scientificwebservices.com/geophires?geophires-example-id=Fervo_Project_Cape-5>`__
* - Fervo Cape Station 6: [Deprecated] 100 MW EGS Modeled on Fervo Cape Station (February 2026 Update)
- `Fervo_Project_Cape-6.txt <tests/examples/Fervo_Project_Cape-6.txt>`__
- `.out <tests/examples/Fervo_Project_Cape-6.out>`__
- `link <https://gtp.scientificwebservices.com/geophires?geophires-example-id=Fervo_Project_Cape-6>`__
* -  
-  
-  
Expand Down
9 changes: 4 additions & 5 deletions docs/Fervo_Project_Cape-5.md
Original file line number Diff line number Diff line change
Expand Up @@ -16,14 +16,11 @@
}
</style>

# GEOPHIRES Case Study: 500 MW EGS Modeled on Fervo Cape Station (February 2026 Update)
# \[Deprecated\] GEOPHIRES Case Study: 500 MW EGS Modeled on Fervo Cape Station (February 2026 Update)

.. raw:: html

<p style="font-style: italic; font-weight: bold;">
<!-- ⚠️️ This is a deprecated version of the case study. -->
ℹ️️ <a href="Fervo_Project_Cape-7.html">Click here</a> to view the October 2026 Update preview version (<tt>Fervo_Project_Cape-7</tt>).
</p>
<p style="font-style: italic; font-weight: bold;">⚠️️ This is a deprecated version of the case study. <a href="Fervo_Project_Cape-7.html">Click here</a> to view an updated version (<tt>Fervo_Project_Cape-7</tt>).</p>

---

Expand Down Expand Up @@ -555,6 +552,8 @@ See [Redrilling Assumptions](#technical-operational-considerations) below for fu

The case study also includes a 100 MWe model, `Fervo_Project_Cape-6`, with equivalent capacity to Phase I.
Note that like the 500 MWe model, `Fervo_Project_Cape-6` represents a SOAK project and not the real-world Phase I implementation as built by Fervo.
`Fervo_Project_Cape-6` is deprecated in favor of the October 2026 Update's
[100 MWe model](Fervo_Project_Cape-7.html#Fervo_Project_Cape-8-section) (`Fervo_Project_Cape-8`).
[Click here](https://gtp.scientificwebservices.com/geophires/?geophires-example-id=Fervo_Project_Cape-6) to view the
100 MWe model in the GEOPHIRES web interface.

Expand Down
24 changes: 14 additions & 10 deletions docs/Fervo_Project_Cape-7.md.jinja
Original file line number Diff line number Diff line change
Expand Up @@ -16,15 +16,7 @@
}
</style>

# \[Preview\] GEOPHIRES Case Study: 500 MW EGS Modeled on Fervo Cape Station (October 2026 Update)

.. raw:: html

<p style="font-style: italic; font-weight: bold;">ℹ️️ This is a preview version of the case study.
<a href="Fervo_Project_Cape-5.html">Click here</a> to view the February 2026 Update (<tt>Fervo_Project_Cape-5</tt>).
</p>

---
# GEOPHIRES Case Study: 500 MW EGS Modeled on Fervo Cape Station (October 2026 Update)

## Introduction

Expand Down Expand Up @@ -504,9 +496,21 @@ rate.

## Variants

<a id="Fervo_Project_Cape-8-section"></a>

### 100 MWe Model (Phase I)

The 100 MWe model, with equivalent capacity to Phase I, has not yet been updated for the October 2026 Update.
The case study also includes a 100 MWe model, `Fervo_Project_Cape-8`, with equivalent capacity to Phase I.
Like the 500 MWe model, `Fervo_Project_Cape-8` represents a SOAK project and not the real-world Phase I implementation
as built by Fervo. It is derived from `Fervo_Project_Cape-7` by reducing the number of production wells, shortening
the construction period, scaling interconnection and transmission costs to 100 MWe, and resizing the debt fraction
to meet the same minimum DSCR target.
[Click here](https://gtp.scientificwebservices.com/geophires/?geophires-example-id=Fervo_Project_Cape-8) to view the
100 MWe model in the GEOPHIRES web interface.

Source code: [Fervo_Project_Cape-8.txt](https://github.com/softwareengineerprogrammer/GEOPHIRES/blob/main/tests/examples/Fervo_Project_Cape-8.txt)
and [Fervo_Project_Cape-8.out](https://github.com/softwareengineerprogrammer/GEOPHIRES/blob/main/tests/examples/Fervo_Project_Cape-8.out).

The February 2026 Update's 100 MWe model, `Fervo_Project_Cape-6`, is documented in the
[February 2026 Update of the case study](Fervo_Project_Cape-5.html#Fervo_Project_Cape-6-section).

Expand Down
Loading
Sorry, something went wrong. Reload?
Sorry, we cannot display this file.
Sorry, this file is invalid so it cannot be displayed.
2 changes: 1 addition & 1 deletion docs/conf.py
Original file line number Diff line number Diff line change
Expand Up @@ -18,7 +18,7 @@
year = '2025'
author = 'NREL'
copyright = f'{year}, {author}'
version = release = '3.19.2'
version = release = '3.19.3'

pygments_style = 'trac'
templates_path = ['./templates']
Expand Down
1 change: 0 additions & 1 deletion docs/index.rst
Original file line number Diff line number Diff line change
Expand Up @@ -25,7 +25,6 @@ Contents

GEOPHIRES-Examples
Fervo_Project_Red
Fervo_Project_Cape-5
Fervo_Project_Cape-7


Expand Down
2 changes: 1 addition & 1 deletion setup.py
Original file line number Diff line number Diff line change
Expand Up @@ -13,7 +13,7 @@ def read(*names, **kwargs):

setup(
name='geophires-x',
version='3.19.2',
version='3.19.3',
license='MIT',
description='GEOPHIRES is a free and open-source geothermal techno-economic simulator.',
long_description='{}\n{}'.format(
Expand Down
2 changes: 1 addition & 1 deletion src/geophires_x/__init__.py
Original file line number Diff line number Diff line change
@@ -1 +1 @@
__version__ = '3.19.2'
__version__ = '3.19.3'
2 changes: 1 addition & 1 deletion tests/examples/Fervo_Project_Cape-5.txt
Original file line number Diff line number Diff line change
@@ -1,4 +1,4 @@
# Case Study: 500 MWe EGS Project Modeled on Fervo Cape Station Phase II
# [Deprecated] Case Study: 500 MWe EGS Project Modeled on Fervo Cape Station Phase II
# See documentation: https://softwareengineerprogrammer.github.io/GEOPHIRES/Fervo_Project_Cape-5.html

# *** ECONOMIC/FINANCIAL PARAMETERS ***
Expand Down
2 changes: 1 addition & 1 deletion tests/examples/Fervo_Project_Cape-6.txt
Original file line number Diff line number Diff line change
@@ -1,4 +1,4 @@
# Case Study: 100 MWe EGS Project Modeled on Fervo Cape Station Phase I
# [Deprecated] Case Study: 100 MWe EGS Project Modeled on Fervo Cape Station Phase I
# See documentation: https://softwareengineerprogrammer.github.io/GEOPHIRES/Fervo_Project_Cape-5.html#Fervo_Project_Cape-6-section

# *** ECONOMIC/FINANCIAL PARAMETERS ***
Expand Down
8 changes: 4 additions & 4 deletions tests/examples/Fervo_Project_Cape-7.out
Original file line number Diff line number Diff line change
Expand Up @@ -4,10 +4,10 @@

Simulation Metadata
----------------------
GEOPHIRES Version: 3.19.1
Simulation Date: 2026-10-14
Simulation Time: 08:56
Calculation Time: 1.861 sec
GEOPHIRES Version: 3.19.2
Simulation Date: 2026-10-15
Simulation Time: 09:42
Calculation Time: 1.862 sec

***SUMMARY OF RESULTS***

Expand Down
1 change: 1 addition & 0 deletions tests/examples/Fervo_Project_Cape-7.txt
Original file line number Diff line number Diff line change
@@ -1,5 +1,6 @@
# Case Study: 500 MWe EGS Project Modeled on Fervo Cape Station Phase II (October 2026 Update)
# See documentation: https://softwareengineerprogrammer.github.io/GEOPHIRES/Fervo_Project_Cape-7.html
#
# October 2026 Update: subsurface design aligned with the Fervo 3.0 well design disclosed for Cape Station Phase II
# (Fervo Energy Q2 2026 earnings call, 2026-08-12). The case study remains a second-of-a-kind (SOAK) analog;
# the wellfield is re-sized for the 3.0 design rather than matched to Fervo's as-built well count, and
Expand Down