Plan release trains, share the dates, export to your calendar.
Visit: www.rail.sh
Pick a first GA date and a cadence, list the milestones that lead up to each release, and the planner lays out every release on a timeline and in a table.
- Milestones are offsets from GA: "Branch cut −6 weeks", "RC1 −4 weeks", "First patch +2 weeks".
- Release names come from a template.
{YYYY},{YY}, and{MM}come from the GA date,{N}is the nth release that year, and{SEQ}is a running number. Edit a name in the table to override it. - Presets cover an RC train, a calendar-versioned biannual release, and a simple monthly release.
A date that lands on a weekend or inside a blackout (a holiday freeze, say) moves to the nearest earlier working day. Moved dates are marked ↶ with the original date and the reason. Dates are calendar dates, so your timezone never shifts them.
- Copy link: the whole schedule lives in the URL, so a link reproduces it exactly. Nothing is stored on a server.
- Download .ics: every milestone becomes an all-day calendar event. As long as the first GA date stays the same, re-importing an updated schedule updates the same events in calendars that support it.
- Copy as Markdown: a table ready for a GitHub issue, a wiki page, or Slack.
Plain HTML, CSS, and JavaScript modules. No dependencies, no build step.
planner.js: schedule math, validation, link encoding, .ics and Markdown output (no DOM)app.js: the pagetest/planner.test.js: tests forplanner.js
Run the tests (Node 24+):
npm testPreview locally. ES modules need HTTP, so opening index.html directly won't work:
python3 -m http.server 8000Then open http://localhost:8000.