Skip to content

Slice 2: Binder + curation v0 #3

Closed

Description

@Blind-Striker

Slice 2 of the SDK build-out (vertical slices; the map is canonical for scope and sequencing).

  • Map: docs/superpowers/plans/2026-08-10-implementation-slice-map.md — § Slice 2
  • Detail plan: written just-in-time before execution; this issue gets ready-for-agent when it exists
  • Deviation protocol: docs/agents/deviation-protocol.md
  • Branch: feature/slice-02-binder-curation (worktree; one PR to master; merge closes this issue)

Done definition: the map's "Done definition — every slice".

Activity

  1. Blind-Striker commented on Aug 25, 2026

    @Blind-Striker
    CollaboratorAuthor

    Closing as superseded: the vertical slice map this issue was scoped by (docs/superpowers/plans/2026-08-10-implementation-slice-map.md) was retired in the Session 15 course correction (research log Q63-Q65; PR #14), and scope/sequencing moved to the deliverable-first milestone model in docs/ROADMAP.md. The work this slice covered is either landed (generator, transport core, Extensions, SSE engine, operation-surface batches) or milestone-anchored there (launcher -> M4, remaining breadth -> M5, integration/operational closure -> M6).

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

Labels

enhancementNew feature or request

Type

No type

Projects

No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions