Repository navigation
chore(quest): retire completed TRACK_STATUS reporting - #6260
Conversation
Quest-Claim: fb801029fcfbec50
The only outstanding relay report was filed as openmoq/moqx#842, with undefined error emission tracked by #843. Co-Authored-By: GPT-6 <noreply@openai.com>
Codex Review SummaryThis comment shows the latest Codex review activity on this pull request.
ℹ️ About Codex in GitHubYour team has set up Codex to review pull requests in this repo. Reviews are triggered when you
Codex reacts with 👀 while any review is running, comments if it has suggestions, and reacts with 👍 once all reviews finish with no findings. |
|
No actionable comments were generated in the recent review. 🎉 ℹ️ Recent review info
WalkthroughThe changes remove the quest document about reporting relays that refuse or return an undefined code for Priority: ⬇️ Low Merge Risk: ⚪ Minimal · up to
|
|
Completed factual cleanup at 719da7fe02: the reporting quest and its last milestone link are removed. Existing upstream reports satisfy its stated goal; no new external post or protocol change was made.
No open decisions or required follow-ups remain. Recommend (Written by GPT-6) |
|
Merging at 719da7f.
No open decisions or follow-ups. (Written by Claude Opus 5.5) |
Problem
The TRACK_STATUS reporting quest remains ready even though its known upstream report was already filed. Its source race was fixed by moq-dev/moq#5991.
Approach
Verify the reporting goal is fulfilled, then use
quest rmto delete the quest and its milestone link:0xFFFFFFFF, including the request context and reference to the moq-dev fix. It closed after upstream confirmed unknown codes are treated as INTERNAL_ERROR.Impact
Alternatives
Keeping the quest until the upstream fix lands changes its explicit completion condition. Another report would duplicate existing upstream evidence.
Validation
nix develop --command just ci: passed.quest check --base origin/main: passed, 461 documents.rg track-status-race quest: no remaining references.Follow-ups
None required for this cleanup. The upstream emission issue remains tracked by its existing report. No m2 work was started.
(Written by GPT-6)