Skip to content

Due dates, and the landed check reaches every repo - #54

Merged
dimeloper merged 1 commit into
mainfrom
feat/due-dates-and-landed-by-default
Sep 22, 2026
Merged

dimeloper merged 1 commit into
mainfrom
feat/due-dates-and-landed-by-default

Conversation

@dimeloper

Copy link
Copy Markdown
Owner

Two changes from one observation: most of a 148-item backlog was already done,
and the report had no way to say so.

1. The landed check was scoped to the repo you were standing in

The one line it printed about everywhere else was a count of work it had
declined to look at:

21 item(s) in other repos name a PR, branch or commit and were not checked.
--landed-all checks them too.

Widened, 14 of those resolve:

Looks already done (13 threads, 14 items) — confirm before ticking
  [landed] PR #276 merged 2026-09-12 · housemaster-frontend
  [landed] PR #125 merged 2026-09-15 · costhub-frontend
  [landed] PR #83  merged 2026-09-16 · housemaster-ingestion
  [landed] `2cb0261` is on origin/main · babypath-frontend
  …

A tenth of the open backlog, closable with evidence, invisible by default.
Work finished in a repo you are not standing in is the thing this report is
worst at noticing, and it was opting out of precisely that.

--landed-here restores the old scope for a run that must not reach into other
repos, and still counts what it skipped. --no-landed is unchanged and remains
the default for the --stale-days audit, which runs on machines with no
checkouts and no gh auth.

2. #due/YYYY-MM-DD — a kind of item the first idea missed

This came out of the question "would triage catch 'check tomorrow that
tonight's scheduled run went through'?"
It would not. The landed check is
ref-bound; an observational follow-up names no PR and cannot be
machine-closed. What it does have is a day.

Every view in this report ages an item from when it was written, which is
backwards for that class:

"Re-measure prod search p95 over a full day (2026-09-18)"
— reported as 4 days open on the 22nd. What is true is 4 days late.

Seven open items were past a date in their own text and nothing had ever said
so.
The class is small — 14 of 217 — and matters more than its size, because
lateness compounds here: a late merge the PR is still doable, a late check
last night's cron run
is unanswerable once the telemetry ages out, which is the
vault's own verify-telemetry-retention-before-trusting-absence.

Overdue (2) — the date in the item has passed
  - due 2026-01-03 (3 days late): Re-measure p95 over a full day   [beta-app]
  - due 2026-01-04 (2 days late): Check last night's run completed  [alpha-service]

Due today (1)
  - Confirm the backfill finished   [alpha-service]

Unreadable `#due/` tag (2)
  - `#due/tomorrow` is not a YYYY-MM-DD date: Check the export ran

Design points, each pinned by a test:

  • Global buckets. A deadline does not care which repo you are standing in,
    so these sit above everything and name their own repo per line.
  • A future date is in neither bucket. The first draft put everything
    not-overdue into "due today", which would have filled the one bucket meaning
    now with commitments a week out.
  • A malformed #due/ gets its own heading rather than falling into the
    undated pile — a mistyped deadline is exactly the one that must not go quiet.
    Includes 2026-02-30, which is shape-valid and not a day.
  • An untagged item is in no bucket. Most follow-ups have no deadline, and a
    bucket listing them would be the backlog again.

Writing the tag is update-second-brain's job, at the moment the session knows
what "tomorrow" means — the skill now says to resolve it to a real date, because
a reader in a week cannot.

Testing

make lint clean. 42 suites, 0 failures. 130 assertions in
test-check-followups (8 new, plus 3 rewritten for the changed default).

Two existing assertions asserted the old scope and now assert the new one, with
the reason recorded in the test rather than only in this PR.

🤖 Generated with Claude Code

…ry repo

Two changes from one observation: most of a 148-item backlog was already done,
and the report had no way to say so.

**The landed check was scoped to the repo you were standing in.** The single
line it printed about everywhere else was a count of work it had declined to
look at — on 2026-09-22, "21 item(s) in other repos name a PR, branch or commit
and were not checked". Widened, 14 of those resolve to already-merged PRs and
branches: a tenth of the open backlog, closable with evidence, that nobody
could see. Work finished in a repo you are not standing in is the thing this
report is worst at noticing, and it was opting out of exactly that.
--landed-here restores the old scope and still counts what it skipped.

**`#due/YYYY-MM-DD` is the other half, and it is a different kind of item.**
The landed check is ref-bound; an observational follow-up — "check tomorrow
that tonight's run went through" — names no ref and cannot be machine-closed.
What it does have is a day, and every view here ages an item from when it was
*written*, which is backwards for it: "re-measure p95 over a full day
(2026-09-18)" read as 4 days open on the 22nd when what was true is 4 days
late. Seven open items were past a date in their own text with nothing ever
saying so.

Small class — 14 of 217 — and it matters more than its size, because lateness
compounds here. A late "merge the PR" is still doable; a late "check last
night's cron run" is unanswerable once the telemetry ages out.

Global buckets, because a deadline does not care which repo you are standing
in. A future date is in neither bucket, which the first draft got wrong. A
`#due/` that is not a real date gets its own heading rather than falling into
the undated pile — a mistyped deadline is the one that must not go quiet.
@dimeloper
dimeloper merged commit 9a63c1e into main Sep 22, 2026
4 checks passed
@dimeloper
dimeloper deleted the feat/due-dates-and-landed-by-default branch September 22, 2026 18:44
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant