Skip to content
Merged
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension


Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
11 changes: 9 additions & 2 deletions .github/workflows/test-suite.yaml
Original file line number Diff line number Diff line change
Expand Up @@ -78,8 +78,15 @@ jobs:
# queued for hours; the parameter tree and every test result are
# identical on both.
runs-on: ${{ vars.CI_RUNNER_ARM != '' && (vars.CI_RUNNER_EVENTS == '' || contains(format(',{0},', vars.CI_RUNNER_EVENTS), format(',{0},', github.event_name))) && vars.CI_RUNNER_ARM || 'ubuntu-24.04-arm' }}
# About 4 minutes on 10 October (run 38085920460).
timeout-minutes: 30
# About 4 minutes on 10 October (run 38085920460). On 27 October 8 of
# 16 pull request and merge-queue jobs hit the 30-minute limit, each
# after its tests had passed, and the other 8 took 22 to 28 minutes
# (two more were cancelled by newer pushes). In merge-queue run
# 40541059060 the cancelled job failed Result once the shards had
# finished, which took that pull request out of the queue. 45 minutes
# leaves room for a slow runner and still stops a hung job; Result
# waits about an hour for the shards anyway.
timeout-minutes: 45
steps:
- name: Checkout repo
uses: actions/checkout@v6
Expand Down
1 change: 1 addition & 0 deletions changelog.d/ci-yaml-test-timeout.changed.md
Original file line number Diff line number Diff line change
@@ -0,0 +1 @@
Give the YAML test job 45 minutes, not 30, so a slow runner no longer cancels it after its tests have passed and takes the pull request out of the merge queue; passing jobs take 22 to 28 minutes.
Loading