Skip to content

Follow-ups for the JRC Seville deck #124

Backlog

Description

@MaxGhenis

Follow-ups from the review of #122 (the JRC Seville deck, slideshows/jrc-seville-harness-2026). None changes what the deck says.

  • Bill forecast screenshot. thesis-stronger-start-spm.png reproduces the forecast page, whose bold equation reads "13.4% − 13.2% = 0.2%". The gap is 0.2 percentage points, and the same line of the page calls it "the 0.2-point gap". Correct the wording on the forecast page, then recapture.
  • Conditional forecast excerpt. thesis-spm-conditional-pe-call.png cuts off both lines of the tool excerpt. Recapture it with wrapping or more width.
  • Walkthrough frame that no longer matches its caption. When axiom.org reports another step or title for a build, the slide sets data-walkthrough-site="differs" and keeps showing the frame, and a PDF export accepts it. Show a fallback after a deadline, and make the export require a match or a local still.
  • Forecast chart rows. ForecastSlide.tsx reads its three rows out of the alt text and throws when that text changes shape. Store the rows as data and build the chart and its description from them.
  • Bare measurement mode. With ?bare=1&measure=1, a mounted neighbour slide can emit a second bare-measure report. Measure the active slide only.

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions