fix: delete only cache tiles touching both the update area and the previous footprint (MAPCO-12035) - #125

Closed
CL-SHLOMIKONCHA wants to merge 2 commits into
masterfrom
fix/MAPCO-12035-cache-deletion-quadtree
Closed

CL-SHLOMIKONCHA wants to merge 2 commits into
masterfrom
fix/MAPCO-12035-cache-deletion-quadtree

Conversation

@CL-SHLOMIKONCHA

Copy link
Copy Markdown
Contributor
Question Answer
Bug fix ✔
New feature ✖
Breaking change ✖
Deprecations ✖
Documentation ✖
Tests added ✔
Chore ✖

Related issues: MAPCO-12035

Alternative to #124: same problem and same job-level change, different range walk. Only one of the two should be merged.

Further information:

Problem. The update cache deletion job walks the whole update area from zoom 0 to the configured max zoom (21). An update that adds a new area next to an existing layer therefore produces millions of deletion tiles, almost all above zoom 16, for ground that was never served and so never cached in redis.

Change.

  • updateJobHandler: at init, before the polygon parts are merged into the catalog, the current catalog footprint is stored on the job as additionalParams.previousFootprint. This is best effort; if the catalog lookup fails a warning is logged and the deletion falls back to the full walk.
  • cacheDeletionJobCreator: with a previous footprint on the job, the creator descends the WorldCRS84 tile tree from the two root tiles and keeps a tile only when it touches both the update area and the previous footprint. A tile that misses either area is dropped with all its descendants. A tile that no footprint edge crosses is wholly inside or wholly outside that footprint, decided by its centre; a tile wholly inside both emits its subtree by arithmetic without being visited. Only the edges that cross a tile are handed to its children, so the work shrinks as the walk narrows onto the boundaries. The emitted set is exactly the tiles touching both areas. The grid helpers mirror the ones mc-utils uses for footprintToTileRanges, applied to two footprints at once.
  • jobParameters.schema: previousFootprint (Polygon or MultiPolygon, optional) on the update and swap finalize params.

Compared with #124. That PR clips the update area per zoom to the previous footprint buffered by one tile diagonal, which needs a planar buffer and leaves a safety rim of up to two tiles. This walk needs no buffer or polygon intersection and has no rim. On an overlap benchmark (2000-vertex previous footprint, update half inside, to zoom 21) it emits 7.13M tiles in 0.27 s against 7.14M tiles in 1.8 s for the buffered walk, and 14.5M tiles in 0.08 s for today's full walk.

Example. A layer near 34.3°E 31.35°N updated with a disjoint polygon near 35.5°E 33.9°N, 2.7° away, produces four ranges, one tile per zoom from 0 to 3, instead of about 1.9 million tiles across zooms 0 to 21. From zoom 4 on the grid row boundary at 33.75° separates the two footprints, so no tile covers both.

Trade-offs, kept on purpose.

  • Zooms above the layer's resolution inside the overlap are still enumerated up to max zoom.
  • Tiles outside the previous footprint that MapProxy upscaled into redis are left to the cache TTL.

Tests. The footprint tests assert exact set equality with an exhaustive oracle of tiles touching both areas: a disjoint update (walk stops at the last zoom whose tile spans the gap), an overlapping update (reaches max zoom, nothing over the new-only ground), an update wholly inside the previous footprint (same tiles as mc-utils' plain walk), and a layer at latitude 32. The update handler tests cover the footprint recording and its fallback.

…APCO-12035)

The update cache deletion job walked the whole update area from zoom 0 to
the configured max zoom, so an update that adds a new area next to an
existing layer produced millions of tiles above zoom 16 for ground that
was never served and never cached.

The update job now records the catalog footprint as previousFootprint at
init, before the polygon parts are merged. The cache deletion creator
clips the update area per zoom to the previous footprint buffered by one
tile diagonal, and stops the walk at the first zoom whose clip is empty,
since a deeper tile cannot touch both areas when its parent does not.
When the footprint cannot be recorded the whole update area is walked as
before.

The buffer is taken in grid degrees: turf measures along the globe, and a
buffer of many degrees around a footprint away from the equator bends
around the sphere and misses the footprint, which ended the walk after
zoom 0 for any real layer.
…ring (MAPCO-12035)

The cache deletion creator descends the WorldCRS84 tile tree from the two
root tiles and keeps a tile only when it touches both the update area and
the previous footprint. A tile that misses either area is dropped with all
its descendants, and a tile wholly inside both emits its subtree by
arithmetic. Only the footprint edges that cross a tile are handed to its
children, so the work shrinks as the walk narrows onto the boundaries.

This replaces the per-zoom buffer and intersection: no geodesic buffer to
flatten, no safety rim, and the emitted set is exactly the tiles touching
both areas. On a 2000-vertex overlap it runs about six times faster than
the buffered walk.
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant