Skip to content

GoreeCloud Code: Fork-to-Native release and integration gates #1

Description

@GoreeCloud

Objective

Rebuild Forgejo as GoreeCloud Code within GoreeCloud/code, using an upstream-derived source bridge and GoreeCloud-owned contracts, design, and policy. This issue tracks work remaining after the development bootstrap; it is not a release declaration.

Gates (all pending until authoritative evidence)

  • Validate tracked Forgejo v15.0.9 LTS source import, exact SHA, license, provenance, all required notices and build.
  • Implement trustworthy Identity sessions, per-resource Code authorization, Wardveil Security/Policy decisions, durable pre-execution audit and recovery-safe write semantics.
  • Integrate Glaze current Stable semantic tokens and components; complete exact-source accessible consumer acceptance.
  • Validate Privacy Shield, Everkeep, Mesh, Manager, Observability, plus all nine Integral Platform System applicability decisions.
  • Implement repos, branches, issues, pull requests/reviews, releases, packages and migration contracts with live Forgejo interoperability tests.
  • Add container-isolated CI, provenance, SBOM and dependency/secrets scanning, plus GoreeCloud AI's explicitly authorized workflows.
  • Prove Git and non-Git metadata migration, backups, restore drills, performance and rollback.
  • Verify exact PR head, protection rules, review, checks, environment acceptance and lifecycle requirements before merge/Stable.

Current known source baseline

Development branch: feat/forgejo-bootstrap. It contains the read-only API and the pinned-source import workflow; source-import success is separately verified in GitHub. Never mark a gate complete from a workflow definition alone.

Priority: P0 for upstream provenance, security and restore gates; P1 for workflows/UI integrations; P2 for enhancements.

Latest verified development increment

All P0/P1 production, upstream build, integration, migration and exact Glaze consumer acceptance gates remain open. Draft PR #2 is the current integration review surface.

Documentation follow-up

Activity

  1. GoreeCloud commented on Oct 8, 2026

    @GoreeCloud
    OwnerAuthor

    Development evidence update: official Forgejo v15.0.9 executable build passed (https://github.com/GoreeCloud/code/actions/runs/37718277264). Corrected pinned Glaze 1.7.0 source check passed (https://github.com/GoreeCloud/code/actions/runs/37718641039). Added repository/documentation CI tests and an opt-in live Code read smoke harness. Production security, live Forgejo integration, Glaze consumer acceptance, Everkeep recovery and release gates remain open; draft PR #2 is not ready to merge.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions