Repository navigation
chore(next): release 10.0.0-beta.11 #4553
Triggered via pull request
November 3, 2026 20:25
Status
Cancelled
Total duration
1m 23s
Artifacts
–
ci.yml
on: pull_request
CI scope
27s
Workflow security
1m 18s
IPR Policy / Signature
1m 17s
Validate conventional commit format
31s
Reliable reporting installed artifacts — positive 2x2
Matrix: pg-conformance
Matrix: pg-reporting-production-installed
Matrix: storyboard
Row storage interop with the JavaScript SDK (Postgres 16)
Reporting status conformance (Postgres 16)
Durable materializer and frozen artifacts (Postgres 16)
Authenticated receipts and installed replay (Postgres 16)
Receipt ownership maintenance upgrade (Postgres 16)
0s
Frozen authorized feed and mounted isolation (Postgres 16)
0s
Feed ownership maintenance upgrade (Postgres 16)
Installed frozen feed (Python 3.10 VCS and sdist)
Production reporting status, ownership and notification contracts
0s
Installed production ownership maintenance upgrade
Web Bot Auth interop with the Cloudflare reference
Downstream import smoke (representative consumer symbols)
Validate schemas are up-to-date
0s
v3 reference seller — pytest (respx-mocked upstream)
0s
AdCP storyboard runner — v3 reference seller (translator)
AdCP storyboard runner — examples/multi_platform_seller (PlatformRouter)
AdCP storyboard runner — sales-proposal-mode (proposal_finalize)
Matrix: test
Reliable reporting installed-artifact 2x2
AdCP storyboard runner — examples/seller_agent.py
Postgres conformance tests (Postgres 16)
Annotations
8 errors and 4 notices
|
CI scope
Canceling since a higher priority waiting request for ci-refs/pull/1850/merge exists
|
|
Validate conventional commit format
Canceling since a higher priority waiting request for ci-refs/pull/1850/merge exists
|
|
Validate conventional commit format
Process completed with exit code 1.
|
|
IPR Policy / Signature
Canceling since a higher priority waiting request for ci-refs/pull/1850/merge exists
|
|
IPR Policy / Signature
The operation was canceled.
|
|
Workflow security
Canceling since a higher priority waiting request for ci-refs/pull/1850/merge exists
|
|
Workflow security
The operation was canceled.
|
|
CI
Canceling since a higher priority waiting request for ci-refs/pull/1850/merge exists
|
|
CI scope
"The ubuntu-latest label will migrate to Ubuntu 26 beginning October 19, 2026. For more information, see https://github.com/actions/runner-images/issues/14748"
|
|
Validate conventional commit format
"The ubuntu-latest label will migrate to Ubuntu 26 beginning October 19, 2026. For more information, see https://github.com/actions/runner-images/issues/14748"
|
|
IPR Policy / Signature
"The ubuntu-latest label will migrate to Ubuntu 26 beginning October 19, 2026. For more information, see https://github.com/actions/runner-images/issues/14748"
|
|
Workflow security
"The ubuntu-latest label will migrate to Ubuntu 26 beginning October 19, 2026. For more information, see https://github.com/actions/runner-images/issues/14748"
|