diff --git a/.github/workflows/test-suite.yaml b/.github/workflows/test-suite.yaml index 4ca22379be..18b02696ec 100644 --- a/.github/workflows/test-suite.yaml +++ b/.github/workflows/test-suite.yaml @@ -78,8 +78,15 @@ jobs: # queued for hours; the parameter tree and every test result are # identical on both. runs-on: ${{ vars.CI_RUNNER_ARM != '' && (vars.CI_RUNNER_EVENTS == '' || contains(format(',{0},', vars.CI_RUNNER_EVENTS), format(',{0},', github.event_name))) && vars.CI_RUNNER_ARM || 'ubuntu-24.04-arm' }} - # About 4 minutes on 10 October (run 38085920460). - timeout-minutes: 30 + # About 4 minutes on 10 October (run 38085920460). On 27 October 8 of + # 16 pull request and merge-queue jobs hit the 30-minute limit, each + # after its tests had passed, and the other 8 took 22 to 28 minutes + # (two more were cancelled by newer pushes). In merge-queue run + # 40541059060 the cancelled job failed Result once the shards had + # finished, which took that pull request out of the queue. 45 minutes + # leaves room for a slow runner and still stops a hung job; Result + # waits about an hour for the shards anyway. + timeout-minutes: 45 steps: - name: Checkout repo uses: actions/checkout@v6 diff --git a/changelog.d/ci-yaml-test-timeout.changed.md b/changelog.d/ci-yaml-test-timeout.changed.md new file mode 100644 index 0000000000..385d2e1b2f --- /dev/null +++ b/changelog.d/ci-yaml-test-timeout.changed.md @@ -0,0 +1 @@ +Give the YAML test job 45 minutes, not 30, so a slow runner no longer cancels it after its tests have passed and takes the pull request out of the merge queue; passing jobs take 22 to 28 minutes.